[1] Carper K L. Structural failures during construction[J]. Journal of performance of constructed facilities, 1987, 1(3): 132-144. DOI: 10.1061/(ASCE)0887-3828(1987)1:3(132).
[2] Hadipriono F C, Wang H K. Causes of falsework collapses during construction[J]. Structural Safety, 1987, 4(3): 179-195. DOI: 10.1016/0167-4730(87)90012-9.
[3] Cimellaro G P, Domaneschi M. Stability analysis of different types of steel scaffolds[J]. Engineering Structures, 2017, 152: 535-548. DOI:10.1016/j.engstruct.2017.07.091.
[4] Buitrago M, Moragues J J, Calderón P A, et al. Structural failures in cast-in-place reinforced concrete building structures under construction[J]. Handbook of Materials Failure Analysis, 2018, 6: 153-170. DOI: 10.1016/B978-0-08-101928-3.00008-2.
[5] Structural Engineering Institute. Design loads on structure during construction: SEI/ASCE 37-02 [S]. Reston, VA, USA: American Society of Civil Engineers, 2002.
[6] Zhang C M, Fang D P, Geng C D, et al. In situ investigation and statistical analysis of live loads of reinforced concrete buildings during construction[J]. Engineering mechanics, 2002, 19(5): 62-66. DOI:CNKI:SUN:GCLX.0.2002-05-011. (in Chinese)
[7] Hu X P, Peng G, Zhang C Z, et al. Investigation and statistical analysis of variable loads of concrete building during construction[J]. Journal of Hohai University(Natural Sciences), 2019, 47(02): 131-137. DOI:10.3876/j.issn.1000-1980.2019.02.007. (in Chinese)
[8] Jian C J, Hu C M, Ye Z W, et al. In situ investigation and statistical analysis of live loads of large span frame structure during construction[J]. Construction Technology, 2015, 44(15):32-34. DOI: CNKI:SUN:SGJS.0.2015-15-011.(in Chin- ese)
[9] Xie N, Zhang J, Zhang L, et al. Surveys and statistical analyses of construction loads during concrete placement based on influence surface[J]. Engineering Mechanics, 2015, 32(2):90-96. DOI:10.6052/j.issn.1000-4750.2013.08.0 729. (in Chinese)
[10] Karshenas S, Ayoub H. Construction live loads on slab formworks before concrete placement[J]. Structural Safety, 1994, 14(3): 155-172. DOI:10.1016/0167-4730(94)90082-5.
[11] Ayoub H, Karshenas S. Survey results for concrete construction live loads on newly poured slabs[J]. Journal of Structural Engineering, 1994, 120(5): 1543-1562. DOI: 10.1061/(asce)0733-9445(1994)120:5(1543).
[12] Rosowsky D V, Philbrick T W, Huston D R. Observations from shore load measurements during concrete construction[J]. Journal of Performance of Constructed Facilities, 1997, 11(1):18-23. DOI: 10.1061/(ASCE)0887-3828(1997)11: 1(18).
[13] IkE4;heimonen J. Construction loads on shores and stability of horizontal formworks[D]. Stockholm, Sweden: Royal Institute of Technology, 1997.
[14] Puente I, Azkune M, Insausti A. Shore-slab interaction in multistory reinforced concrete buildings during construction: An experimental approach[J]. Engineering Structures, 2007, 29(5): 731-741. DOI: 10.1016/j.engstruct.2006.06.018.
[15] Zhang H, Reynolds J, Rasmussen K J R, et al. Reliability-based load requirements for formwork shores during concrete placement[J]. Journal of Structural Engineering, 2016, 142(1):04015094. DOI: 10.1061/(ASCE)ST.1943-541X.0001 362.
[16] Jin W L, Yuan X X, Liu X, et al. Grey relational comprehensive evaluation based on fuzzy numbers and its application in risk analysis for fastener-style tubular steel formwork-support[J]. Journal of Southeast University(Natural Science Edition), 2006, 36(4):621-624. DOI:1001-0505(2006)04-0621-04. (in Chinese)
[17] Yuan X X, Jin W L, Chen T M. Structural reliability of reinforced-concrete building under construction[J]. Industrial Construction, 2011, 41(5):60-65. DOI:10.13204/j.gyjz2011. 05.017. (in Chinese)
[18] Rosowsky D V, Stewart M G. Probabilistic construction load model for multistory reinforced-concrete buildings[J]. Journal of Performance of Constructed Facilities, 2001, 15(4): 145-152. DOI: 10.1061/(ASCE)0887-3828(2001)15:4(145).
[19] Standards Policy and Strategy Committee. Falsework—Performance requirements and general design: BS EN 12812:2008 [S]. London, UK: British Standards Institution, 2011.
[20] Standards Australia. Formwork for concrete: AS 3610-1995 [S]. Sydney, Australia: Standards Australia, 1995.
[21] Karshenas S, Ayoub H. Analysis of concrete construction live loads on newly poured slabs[J]. Journal of Structural Engineering, 1994, 120(5): 1525-1542. DOI: 10.10 61/(ASCE)0733-9445(1994)120:5(1525).
[22] Peir J C, Cornell C A. Spatial and temporal variability of live loads[J]. Journal of the Structural Division, 1973, 99(5): 903-922. DOI: 10.1061/JSDEAG.0003512.
[23] Du T, Xie N, Liu Z T, et al. Probabilistic limit state design of falsework considering joint lap defects during concrete pouring period[J]. Journal of Southeast University(Natural Science Edition), 2021, 51(4):575-580.(in Chinese)