|Table of Contents|

[1] Lin Jiankang, Chen Zhongfan, Ding Xiaomeng, Feng Yan, et al. BIM-based construction technologies forprecast foamed lightweight concrete wallboards [J]. Journal of Southeast University (English Edition), 2022, 38 (3): 270-277. [doi:10.3969/j.issn.1003-7985.2022.03.008]
Copy

BIM-based construction technologies forprecast foamed lightweight concrete wallboards()
基于BIM的预制泡沫轻质混凝土墙板建造技术
Share:

Journal of Southeast University (English Edition)[ISSN:1003-7985/CN:32-1325/N]

Volumn:
38
Issue:
2022 3
Page:
270-277
Research Field:
Architecture
Publishing date:
2022-09-20

Info

Title:
BIM-based construction technologies forprecast foamed lightweight concrete wallboards
基于BIM的预制泡沫轻质混凝土墙板建造技术
Author(s):
Lin Jiankang Chen Zhongfan Ding Xiaomeng Feng Yan Zhang Jiaheng
Key Laboratory of Concrete and Pre-stressed Concrete Structures of Ministry of Education, Southeast University, Nanjing 210096, China
林健康 陈忠范 丁小蒙 冯岩 张家珩
东南大学混凝土及预应力混凝土结构教育部重点实验室, 南京 210096
Keywords:
building information modelling(BIM) precast foamed lightweight concrete wallboard(PFLCW) construction visualisation and informatisation parameterised modelling quantity statistics
建筑信息模型(BIM) 预制泡沫轻质混凝土墙板(PFLCW) 建造可视化和信息化 参数化建模 工程量统计
PACS:
TU17
DOI:
10.3969/j.issn.1003-7985.2022.03.008
Abstract:
To promote the visualisation and informatisation of the construction process of precast foamed lightweight concrete wallboards(PFLCWs), from the analysis of the construction requirements of PFLCWs, three key construction technologies based on building information modelling(BIM), namely, parameterised modelling for the PFLCW layout design, drawing generation to draw the PFLCW layout and quantity statistics for extracting PFLCW quantities, are proposed. Then, a reinforced concrete(RC)frame infilled with PFLCW is considered the test model to verify the feasibility of the aforementioned technologies. The results show that PFLCW layout design can be accomplished rapidly and visually using parameterised modelling technology. The PFLCW layout diagram can be generated directly using drawing generation technology. The proposed quantity statistics technology enables the automatic export of PFLCW bills of quantities. The built parameterised model helps construction workers rapidly and intuitively understand the specific layout details of PFLCWs. Moreover, the generated layout drawing and the bills of quantities based on the parameterised model can guide the production and on-site installation of PFLCWs. The research conclusions can serve as a practical guide and technical support for PFLCW engineering applications.
为促进预制泡沫轻质混凝土墙板(PFLCW)建造过程的可视化和信息化, 通过分析PFLCW的建造需求, 提出了基于建筑信息模型(BIM)的3项关键建造技术:用于PFLCW布局设计的参数化建模技术、绘制PFLCW布板图的图纸生成技术和提取PFLCW工程量的工程量统计技术.然后, 将PFLCW填充的钢筋混凝土(RC)框架作为测试模型, 验证所提技术的可行性.结果表明, 参数化建模技术可以实现PFLCW的快速、可视化布局设计.采用图纸生成技术可以直接生成PFLCW布板图.所提工程量统计技术可以自动导出PFLCW的工程量清单.建立的参数化模型有助于施工人员快速、直观地了解PFLCW的具体布置细节.基于参数化模型生成的布置图和工程量清单可指导PFLCW的生产和现场安装.研究结果可作为PFLCW工程应用的有益指导和技术支持.

References:

[1] Dong H, Qin J, Cao W, et al. Shaking table tests on concrete-filled steel tubular-framed building assembled with microcrystalline foam boards[J]. Structures, 2021, 34: 2098-2114. DOI:10.1016/j.istruc.2021.08.064.
[2] Chen Z, Zhao Z, Ding X. Self-insulation system of precast lightweight and high-strength foam concrete filled external wallboard: China, CN211286074U[P]. 2020-08-18.(in Chinese)
[3] Xu Z, Chen Z, Yang S. Effect of a new type of high-strength lightweight foamed concrete on seismic performance of cold-formed steel shear walls[J].Construction and Building Materials, 2018, 181: 287-300. DOI:10.1016/j.conbuildmat.2018.06.067.
[4] Chen Z, Ding X, Zhao Z. Non-collapse mould for pouring lightweight high-strength foamed concrete: China, CN212045221U[P]. 2020-12-01.(in Chinese)
[5] Zhao Z. Study on mechanics performance of foamed concrete prefabricated filled wallboards[D]. Nanjing: Southeast university, 2019.(in Chinese)
[6] Zhao X. A scientometric review of global BIM research: Analysis and visualization[J].Automation in Construction, 2017, 80: 37-47. DOI:10.1016/j.autcon.2017.04.002.
[7] Chen J, Luo Y, Zhang H, et al. Quality evaluation of lightweight realistic 3D model based on BIM forward design[J].Computer Communications, 2021, 174: 75-80. DOI:10.1016/j.comcom.2021.04.017.
[8] Cheng M Y, Chang N W. Dynamic construction material layout planning optimization model by integrating 4D BIM[J]. Engineering with Computers, 2019, 35(2): 703-720. DOI:10.1007/s00366-018-0628-0.
[9] Abbasi S, Taghizade K, Noorzai E. BIM-based combination of takt time and discrete event simulation for implementing just in time in construction scheduling under constraints[J]. Journal of construction engineering and management, 2020, 146(12): 04020143. DOI:10.1061/(ASCE)CO.1943-7862.0001940.
[10] Wang Z, Zhang Q, Yang B, et al. Vision-based framework for automatic progress monitoring of precast walls by using surveillance videos during the construction phase[J]. Journal of Computing in Civil Engineering, 2021, 35(1): 04020056. DOI:10.1061/(ASCE)CP.1943-5487.0000933.
[11] Xu Z, Zhang Y, Xu X. 3D visualization for building information models based upon IFC and WebGL integration[J]. Multimedia Tools and applications, 2016, 75(24): 17421-17441. DOI:10.1007/s11042-016-4104-9.
[12] Xu Z, Xu X, Li Q, et al. Combining WebGL and IFC to create 3D visualization for building information models[J]. Journal of Southeast University(Natural Science Edition), 2016, 46(2): 444-449. DOI:10.3969 /j.issn.1001-0505.2016.02.033. (in Chinese)
[13] Liu J, Zhang Q, Wu J, et al. Dimensional accuracy and structural performance assessment of spatial structure components using 3D laser scanning[J]. Automation in Construction, 2018, 96: 324-336. DOI:10.1016/j.autcon.2018.09.026.
[14] Duan K K, Cao S Y. Emerging RFID technology in structural engineering—A review[J]. Structures, 2020, 28: 2404-2414. DOI:10.1016/j.istruc.2020.10.036.
[15] Feng Z, Liu W, Jin B, et al. Research on application of BIM technologies in masonry construction[J].Journal of Information Technology in Civil Engineering and Architecture, 2020, 12(4): 99-103. DOI:10.16670/j.cnki.cn11-5823/tu.2020.04.13. (in Chinese)
[16] Liu Y, Li M, Wong B C L, et al. BIM-BVBS integration with openBIM standards for automatic prefabrication of steel reinforcement[J].Automation in Construction, 2021, 125: 103654. DOI:10.1016/j.autcon.2021.103654.
[17] Ministry of Housing and Urban-Rural Development of the People’s Republic of China. Standard for classification and coding building information model: GB/T 51269—2017[S]. Beijing:China Architecture & Building Press, 2017.(in Chinese)
[18] He X, Wang H, Zhang Y, et al. Revit-Midas/Civil model conversion method and its application[J].Journal of Southeast University(Natural Science Edition), 2021, 51(5): 813-818. DOI:10.3969/j.issn.1001-0505.2021.05.012. (in Chinese)

Memo

Memo:
Biographies: Lin Jiankang(1993—), male, Ph.D. candidate; Chen Zhongfan(corresponding author), male, doctor, professor, 101003944@seu.edu.cn.
Foundation items: The National Key Research and Development Program of China(No. 2020YFD1100404-4), the National Natural Science Foundation for Young Scientists of China(No. 52108120), the National Natural Science Foundation for Young Scientists of Jiangsu Province(No. BK20210258).
Citation: Lin Jiankang, Chen Zhongfan, Ding Xiaomeng, et al.BIM-based construction technologies for precast foamed lightweight concrete wallboards[J].Journal of Southeast University(English Edition), 2022, 38(3):270-277.DOI:10.3969/j.issn.1003-7985.2022.03.008.
Last Update: 2022-09-20