FNM method for estimating reliability of existing bridges()
Share:

Journal of Southeast University (English Edition)[ISSN:1003-7985/CN:32-1325/N]

Volumn:
25
Issue:
2009 2
Page:
247-251
Research Field:
Traffic and Transportation Engineering
Publishing date:
2009-06-30

Info

Title:
FNM method for estimating reliability of existing bridges
Author(s):
Peng Keke Huang Peiyan
School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510641, China
Keywords:
existing bridges time-dependent reliability three-stage working mode Monte-Carlo simulation FNM method
PACS:
U416.21
DOI:
10.3969/j.issn.1003-7985.2009.02.022
Abstract:
Combined with current specifications and stress characteristics of concrete filled steel tubular(CFST)arch bridges, the determination principle of safe-middle-failure three-stage mode is given.Accordingly, damage probability and failure probability and the corresponding reliability indices are calculated; a direct relationship between reliability indices and three-stage working status is made. Based on the three-stage working mode, a combined FNM(finite element-neural network-Monte-Carlo simulation)method is put forward to estimate the reliability of existing bridges.According to time-dependent reliability theory, subsequent service time is divided into several stages;minimum samples required by the Monte-Carlo method are generated by random sampling;training samples are calculated by the finite element method, and the training samples are extended by the neural network;failure probability and damage probability are calculated by the Monte-Carlo method.Thus, time dependent reliability indices are obtained, and the working status is judged.A case study is investigated to estimate the reliability of an actual bridge by the FNM method.The bridge is a CFST arch bridge with an 83.6 m span and it has been in operation for 10 years.According to analysis results, in the tenth year, the example bridge is still in safe status.This conclusion is consistent with the facts, which proves the feasibility of the FNM method for estimating the reliability of existing bridges.

References:

[1] Petcherdchoo A, Neves L A C, Frangopol D M.Optimizing lifetime condition and reliability of deteriorating structures with emphasis on bridges[J].Journal of Structural Engineering, 2008, 134(4):544-552.
[2] Lee J, Sanmugarasa K, Blumenstein M, et al.Improving the reliability of a bridge management system(BMS)using an ANN-based backward prediction mode(BPM)[J].Automation in Construction, 2008, 17(6):758-772.
[3] Frangopol D M, Strauss A, Kim S.Bridge reliability assessment based on monitoring[J].Journal of Bridge Engineering, 2008, 13(3):258-270.
[4] Akgul F, Frangopol D M.Bridge rating and reliability correlation:comprehensive study for different bridge types[J].Journal of Structural Engineering, 2004, 130(7):1063-1074.
[5] Czamecki A A, Nowak A S.Time-variant reliability profiles for steel girder bridges[J].Structural Safety, 2008, 30(1):49-64.
[6] Wang Guangyuan.Engineering structure and system fuzzy reliability analysis[M].Nanjing:Southeast University Press, 2001:7-15.(in Chinese)
[7] Li Yanghai, Bao Weigang.Reliability and ultimate limit status design of highway bridge[M].Beijing:China Communications Press, 1997:88-103.(in Chinese)
[8] Guo Zhenhai.Reinforced concrete structures design theory[M].Beijing:Tsinghua University Press, 1999:17-18;52-53.(in Chinese)
[9] Cheng Baochun.Design and construction of concrete-filled steel tubular bridges[M].Beijing:China Communications Press, 2000:42-45.(in Chinese)
[10] Ministry of Communications of China.JTG D62—2004 Code for design of highway reinforced concrete and prestressed concrete bridge and culverts [S].Beijing:China Communications Press, 2004.(in Chinese)
[11] China Association for Engineering Construction Standardization.CESC28—90 Specification for design and construction of concrete-filled steel tubular structures[S].Beijing:China Planning Press, 1990.(in Chinese)
[12] Hunter A.Feature selection using probabilistic neural networks [J].Neural Computing and Applications, 2000, 9(2):124-132.
[13] Ministry of Transport of China. GB/T 50283—1999 Unified standard for reliability design of highway engineering structures [S].Beijing:China Communications Press, 1999.(in Chinese)

Memo

Memo:
Biographies: Peng Keke(1978—), female, graduate;Huang Peiyan(corresponding author), male, doctor, professor, pyhuang@scut.edu.cn.
Foundation item: The National Natural Science Foundation of China(No.10672060).
Citation: Peng Keke, Huang Peiyan.FNM method for estimating reliability of existing bridges[J].Journal of Southeast University(English Edition), 2009, 25(2):247-251.
Last Update: 2009-06-20