[1] Venkatesh S, Davenport R, Foxhoven P, et al. A steady-state throughput analysis of cluster tools: dual-blade versus single-blade robots[J]. IEEE Transactions on Semiconductor Manufacturing, 1997, 10(4): 418-424.
[2] Lee T E, Park S H. An extended event graph with negative places and tokens for timed window constraints[J]. IEEE Transactions on Automation Science and Engineering, 2005, 2(4): 319-332.
[3] Kim J H, Lee T E, Park D B, et al. Scheduling analysis of time-constrained dual-armed cluster tools [J]. IEEE Transactions on Semiconductor Manufacturing, 2003, 16(3): 521-534.
[4] Rostami S, Hamidzadeh B. An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints[J]. IEEE Transactions on Robotics and Automation, 2001, 17(5): 609-618.
[5] Rostami S, Hamidzadeh B. An optimal residency-aware scheduling technique for cluster tools with buffer module[J]. IEEE Transactions on Semiconductor Manufacturing, 2004, 17(1): 68-73.
[6] Yoon H J, Lee D Y. On-line scheduling of integrated single wafer processing tools with temporal constraints[J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 18(3): 390-398.
[7] Perkinson T L, Gyurcsik R S, McLarty P K. Single-wafer cluster tool performance: an analysis of the effects of redundant chambers and revisitation sequences on throughput[J]. IEEE Transactions on Semiconductor Manufacturing, 1996, 9(3): 384-400.
[8] Lee H Y, Lee T E. Scheduling single-arm cluster tools with reentrant wafer flows[J]. IEEE Transactions on Semiconductor Manufacturing, 2006, 19(2): 226-240.
[9] Zuberek W M. Cluster tools with chamber revisiting-modeling and analysis using timed Petri nets[J]. IEEE Transactions on Semiconductor Manufacturing, 2004, 17(3): 333-344.
[10] Zuberek W M. Petri net modeling and performance analysis of cluster tools with chamber revisiting[C]//The 8th International Conference on Emerging Technologies and Factory Automation. Antibes-Juan les Pins, France, 2001, 2: 105-112.
[11] Jung C Y, Lee T E. An efficient mixed integer programming model based on timed Petri nets for diverse complex cluster tool scheduling problems[J]. IEEE Transactions on Semiconductor Manufacturing, 2012, 25(2): 186-199.
[12] Wu N Q, Chu F, Chu C B, et al. Petri net-based scheduling of single-arm cluster tools with reentrant atomic layer deposition processes[J]. IEEE Transactions on Automation Science and Engineering, 2011, 8(1): 42-55.
[13] Wu N Q, Chu F, Chu C B, et al. Petri net-based cycle time analysis of dual-arm cluster tools with wafer revisiting and swapping strategy[C]//2011 IEEE International Conference on Robotics and Automation. Shanghai, China, 2011: 5499-5504.
[14] Kim D K, Jung C Y, Lee T E, et al. Cyclic scheduling of cluster tools with non-identical chamber access times[C]//Proceedings of the 2011 Winter Simulation Conference. Phoenix, AZ, USA, 2011: 2068-2079.
[15] Wu N Q, Zhou M C. Schedulability analysis and optimal scheduling of dual-armed cluster tools with residency time constraint and activity time variation[J]. IEEE Transactions on Automation Science and Engineering, 2012, 9(1): 203-209.